Contractor / MEP subcontract cabling
UltraTech Kuwait takes on structured cabling and low-current packages as a subcontractor for main and MEP contractors in Kuwait. We price from tender drawings, submit materials for approval, install to programme and hand over test reports and as-built drawings.
Reviewed by Eng. M. Ahmed, Project Manager, IT Operations · Updated
Book a site visit
20 KWDDeducted from your invoice when you go ahead
An engineer visits for contractor / MEP subcontract cabling, Sunday – Thursday, 9:30 am – 6 pm.
Book a visitor get a quote without a visit →At a glance
- Where
- All six governorates of Kuwait
- Site visit
- 20 KWD, deducted from your invoice
- Response
- Within 4 hours (SLA)
- For
- Main contractors, MEP contractors, consultants
- Scope
- Supply and install, or labour only
- Paperwork
- Submittals, shop drawings, test reports, as-built
More in Building & Project Cabling
What does subcontracted cabling cost in Kuwait?
Typical Kuwait prices in 2026, equipment and installation included. Your exact price is fixed in writing after the site visit (20 KWD, deducted from your invoice when you go ahead).
| Cat6 point, supply and install (project volume) | 10 – 16 KWD |
| Cat6 point, labour only (pull, terminate, test) | 4 – 8 KWD |
| Fiber splicing, per core | 2 – 5 KWD |
| Certification per point, with report | 2 – 5 KWD |
| Shop drawings and as-built package | quoted per project |
What moves the price
- Supply and install, or labour only
- Volume and programme
- Documentation requirements
- Site access and working hours
What we need to price your package
Send what you have; we price from drawings and BOQ.
Documents
- Tender drawings and specification
- BOQ, if prepared
- Approved brands list, if any
Scope
- Supply and install, or labour only
- Which low-current systems are in scope
- Testing and documentation required
Programme
- Start date and key milestones
- Site working hours
- Payment terms and retention
How does a subcontract package run?
From tender to handover, aligned with the main programme.
- 1
Tender
Bid stage
BOQ priced, exclusions and programme stated.
- 2
Submittals
First weeks
Materials, shop drawings and method statements approved.
- 3
First fix
With MEP
Containment, sleeves and back boxes.
- 4
Second fix and testing
After wet works
Cable, terminations, certification per floor.
- 5
Handover
Before snagging
Test reports, as-built drawings and O&M.
What people ask before they hire
What does subcontracted cabling cost in Kuwait?
At project volume, about 10–16 KWD per Cat6 point supplied and installed, or 4–8 KWD per point for labour only (pulling, termination and testing).
Do you prepare submittals and shop drawings?
Yes. Material submittals, shop drawings, method statements, test reports and as-built drawings in the format consultants expect.
Can you work to the main contractor's programme?
Yes. We plan first-fix and second-fix with the MEP programme and attend site meetings.
Do you provide manpower only?
Yes, labour-only packages with our supervision and testing are available.
How much is a site visit?
20 KWD, deducted from your invoice when you go ahead.
What main contractors tell us goes wrong with cabling subcontractors
And how we run a package instead.
01Submittals late, approvals delayed
Our fix: We submit materials and drawings in the first weeks.
02No test reports at handover
Our fix: Every point certified; reports per floor as floors complete.
03Manpower that disappears mid-project
Our fix: A fixed team with a named supervisor for the whole package.
04As-built drawings missing
Our fix: Drawn as we go, handed over with the last floor.
What do you get at handover?
Test report
Every point tested end to end, results per point.
Labels both ends
Outlet and patch panel match the port map.
Dressed rack
Cable managers, patch cords cut to length.
As-built drawings
Floor plans with every point and route.
Port map
Which outlet goes to which panel port.
One contact
The engineer who built it stays your point of contact.
Which documents do we submit?
The paperwork main contractors and consultants expect from a low-current subcontractor.
| Document | What it is for | When |
|---|---|---|
| Material submittal | Datasheets and samples for approval | Before ordering |
| Shop drawings | Point layouts, routes, risers, rack elevations | Before first fix |
| Method statement | How the work is done safely and to standard | Before work starts |
| Inspection and test plan | What is inspected and tested, and who witnesses it | Before work starts |
| Test reports | Certification per point and per fiber | Per floor |
| As-built drawings | Everything as installed | At handover |
| O&M manual | Equipment, warranties and contacts | At handover |
How does it work?
- Step 1
Tender and scope
BOQ priced, scope and programme agreed.
- Step 2
Submittals
Materials, shop drawings and method statements.
- Step 3
Execution
First fix, second fix and testing to programme.
- Step 4
Handover
Test reports, as-built drawings and labels per floor.
Our recent network work in Kuwait
All projects and case studies →Who does the work
The delivery team behind every project, from our team page.
Standards and specifications
Submittals
Materials, datasheets, method statements.
Drawings
Shop drawings and as-built in CAD.
Testing
Certification per point; fiber loss per core.
Safety
HSE plan and supervision on site.
Which equipment do we install?
Contracting terms, explained
- BOQ
- Bill of quantities: the itemised list a package is priced against.
- Method statement
- A document describing how work is done safely and to standard.
- ITP
- Inspection and test plan: what is checked, when, and who signs it.
- MEP
- Mechanical, electrical and plumbing: the services contractor we coordinate with.
- Snagging
- The final list of defects to fix before handover.
Keep exploring
Book a site visit and get a written quote
20 KWD, deducted from your invoice when you go ahead. We reply within working hours.

