Contractor / MEP subcontract cabling

UltraTech Kuwait takes on structured cabling and low-current packages as a subcontractor for main and MEP contractors in Kuwait. We price from tender drawings, submit materials for approval, install to programme and hand over test reports and as-built drawings.

Reviewed by Eng. M. Ahmed, Project Manager, IT Operations · Updated

What does subcontracted cabling cost in Kuwait?

Typical Kuwait prices in 2026, equipment and installation included. Your exact price is fixed in writing after the site visit (20 KWD, deducted from your invoice when you go ahead).

Cat6 point, supply and install (project volume)10 – 16 KWD
Cat6 point, labour only (pull, terminate, test)4 – 8 KWD
Fiber splicing, per core2 – 5 KWD
Certification per point, with report2 – 5 KWD
Shop drawings and as-built packagequoted per project

What moves the price

  • Supply and install, or labour only
  • Volume and programme
  • Documentation requirements
  • Site access and working hours

What we need to price your package

Send what you have; we price from drawings and BOQ.

Documents

  • Tender drawings and specification
  • BOQ, if prepared
  • Approved brands list, if any

Scope

  • Supply and install, or labour only
  • Which low-current systems are in scope
  • Testing and documentation required

Programme

  • Start date and key milestones
  • Site working hours
  • Payment terms and retention

How does a subcontract package run?

From tender to handover, aligned with the main programme.

  1. 1

    Tender

    Bid stage

    BOQ priced, exclusions and programme stated.

  2. 2

    Submittals

    First weeks

    Materials, shop drawings and method statements approved.

  3. 3

    First fix

    With MEP

    Containment, sleeves and back boxes.

  4. 4

    Second fix and testing

    After wet works

    Cable, terminations, certification per floor.

  5. 5

    Handover

    Before snagging

    Test reports, as-built drawings and O&M.

What people ask before they hire

What does subcontracted cabling cost in Kuwait?

At project volume, about 10–16 KWD per Cat6 point supplied and installed, or 4–8 KWD per point for labour only (pulling, termination and testing).

Do you prepare submittals and shop drawings?

Yes. Material submittals, shop drawings, method statements, test reports and as-built drawings in the format consultants expect.

Can you work to the main contractor's programme?

Yes. We plan first-fix and second-fix with the MEP programme and attend site meetings.

Do you provide manpower only?

Yes, labour-only packages with our supervision and testing are available.

How much is a site visit?

20 KWD, deducted from your invoice when you go ahead.

What main contractors tell us goes wrong with cabling subcontractors

And how we run a package instead.

  1. 01Submittals late, approvals delayed

    Our fix: We submit materials and drawings in the first weeks.

  2. 02No test reports at handover

    Our fix: Every point certified; reports per floor as floors complete.

  3. 03Manpower that disappears mid-project

    Our fix: A fixed team with a named supervisor for the whole package.

  4. 04As-built drawings missing

    Our fix: Drawn as we go, handed over with the last floor.

What do you get at handover?

Test report

Every point tested end to end, results per point.

Labels both ends

Outlet and patch panel match the port map.

Dressed rack

Cable managers, patch cords cut to length.

As-built drawings

Floor plans with every point and route.

Port map

Which outlet goes to which panel port.

One contact

The engineer who built it stays your point of contact.

Which documents do we submit?

The paperwork main contractors and consultants expect from a low-current subcontractor.

DocumentWhat it is forWhen
Material submittalDatasheets and samples for approvalBefore ordering
Shop drawingsPoint layouts, routes, risers, rack elevationsBefore first fix
Method statementHow the work is done safely and to standardBefore work starts
Inspection and test planWhat is inspected and tested, and who witnesses itBefore work starts
Test reportsCertification per point and per fiberPer floor
As-built drawingsEverything as installedAt handover
O&M manualEquipment, warranties and contactsAt handover

How does it work?

  1. Step 1

    Tender and scope

    BOQ priced, scope and programme agreed.

  2. Step 2

    Submittals

    Materials, shop drawings and method statements.

  3. Step 3

    Execution

    First fix, second fix and testing to programme.

  4. Step 4

    Handover

    Test reports, as-built drawings and labels per floor.

Our recent network work in Kuwait

All projects and case studies →

Who does the work

The delivery team behind every project, from our team page.

3IT Project Manager & Delivery LeadProgramme, coordination and site meetings
2Fiber Optics & Structured Cabling TechnicianTermination, splicing and testing
26Site Installation & Logistics Support WorkforcePulling and installation crews
✓Document Controller & Quality Assurance SpecialistSubmittals and QA records
✓CAD & As-Built Documentation SpecialistShop and as-built drawings
✓Health, Safety & Environment (HSE) CoordinatorSite safety
Meet the team →

Standards and specifications

Submittals

Materials, datasheets, method statements.

Drawings

Shop drawings and as-built in CAD.

Testing

Certification per point; fiber loss per core.

Safety

HSE plan and supervision on site.

Which equipment do we install?

Contracting terms, explained

BOQ
Bill of quantities: the itemised list a package is priced against.
Method statement
A document describing how work is done safely and to standard.
ITP
Inspection and test plan: what is checked, when, and who signs it.
MEP
Mechanical, electrical and plumbing: the services contractor we coordinate with.
Snagging
The final list of defects to fix before handover.

Book a site visit and get a written quote

20 KWD, deducted from your invoice when you go ahead. We reply within working hours.